From: route@monster.com
Sent: Friday, April 29, 2016 3:30 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: osp engineer
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
Professional Experience
Supervisor /
Specialist Smart Communications Inc. | June 2013 – present ·
Oversees
development of plans, high and low level designs, and budget approval of
projects under my area of responsibility. ·
Conducts analysis
of existing network utilization for capacity planning, project recommendation
and budget approval intended for network modernization from TDM into IP
network. ·
Develops
transport solution for RAN (Abis, 3G-IUB, LTE S1 and X2), BSC (Ater, SS7,
Gblink), RNC (IUPS, IUCS, Signaling), and broadband services requirements
such as Canopy, Wi-Fi and Wi-Max. ·
Handles the
planning, design and budget allocation of the transport network synergy: o
Smart
Communications Inc. and PLDT Co. transport synergy. o
Smart Communications
Inc. and Sun Cellular transport network integration. ·
Conducted Proof
of Concept for the following equipment: o
ECI MCSM-50
module o
ZTE Outdoor CEN
equipment o
Technical
evaluation of E-band and V-band radios for Aviat, Ceragon, Ericsson, Huawei,
NEC, NSN, Siklu, Siae and ZTE. ·
Participates on
technology roadshows organized by different vendors. Senior Engineer Smart Communications Inc. | January 2011 – June 2013 ·
Developed
fundamental plans, high and low level designs, and worked on budget approval
for Smart’s 3-year modernization portfolio which includes: o
Migration of
TDM network into IP through CEN (ZTE and FiberHome). o
Establishment
of high capacity optical network via integration of ROADM into Smart’s
backbone Transport network (ECI Apollo Family). o
Deployment of
Packet Radios as solution to the modernization of the sites not feasible for
FOC deployment. ·
Conducted Proof
of Concept for Packet Radio offered by different vendors such as Aviat,
Huawei, Ceragon, Alcatel-Lucent, NSN, Ericsson, Nera, NEC, and Fujitsu. ·
Designed the
250-km Palawan Backbone Inland Domestic Fiber Optic Network via Ciena’s
OME6500, and the Puerto Prinsesa CEN City Loop to provide 40 Gbps capacity to
the province, boosting the company’s support to the local tourism of Palawan. ·
Optimization of
Transport network: o
Expansion of
working Hybrid radios by upgrading radio units and licenses, without changing
the current antenna system, thereby minimizing cost, downtime and tower
loading. Engineer Smart Communications Inc. | December 2007 – December 2010 ·
Prepared/issued
detailed engineering plans and work orders for the installation,
commissioning, acceptance, testing, transfer, dismantling, recovery, and
cut-over of transport facilities including the implementation and acceptance
of projects. The engineering plans include the vicinity map, site plan, rack
schedule, floor plan and equipment layout, cableway plan, antenna and
transmission line layout, bill of materials and equipment costing. o
Palawan SDH
Radio Backbone Change-out / Expansion from Nera Interlink 4xSTM-1 to Nera Evo
7xSTM-1 o
Bohol SDH Radio
Backbone Change-out / Expansion from Nera Interlink 4xSTM-1 to NEC DMR5000
7xSTM-1 o
Tagbilaran
City, Bohol Fiber in the Loop ·
Ensured
effective E1/FE management to maximize utilization and for optimum traffic
routing. ·
Ensured
resilient transport network through redundancy and diverse transport
facilities. ·
Provided
transport solution to immediate and future requirements for 2G, 3G, HSPA, and
Wimax. ·
Conducted map
study and on-site surveys for roll-outs/site re-location/site co-location to
verify radio link Line of Site, space availability; or to verify FOC route,
splice points, and other outside plant requirements. ·
Conducted
acceptance tests for microwave radio links and optical fiber testing for new
FOC projects. ·
Developed
assessments and dimensioning plans of ECI and Tellabs multiplexers
considering site requirement and power budget calculations. ·
Has extensive
experience on with end-to-end project management, coordination with vendors
for costing, Bill of Quantities, project design, project implementation and
project acceptance. Wireless Transport: Microwave
link planning, calculation and implementation: ·
Conducts map
study and actual survey for the verification of LOS on-site with first-hand
experience with the use of survey instruments such as binoculars, compass,
digital camera, topographical maps, laptop computer and GPS. ·
Creates
Microwave Radio Link design and calculation using planning tools such as
Pathloss 3.0 and Mapinfo with radios such as Aviat Eclipse, Alcatel-Lucent
AWY, Nokia Flexihopper and Ericsson Minilink. · Conducts study of the propagation conditions for a planned
system including clearance criteria based on ITU Recommendations. This
includes study of the propagating signal using reflection, diffraction and
multipath analysis and calculating availability calculations according to ITU
Recommendations. · Troubleshoots radio frequency interference following ITU
recommendations and through the use of BER tester, Feed Horn Antenna, LNA,
and Spectrum Analyzer. · Facilitates frequency plan, study and licensing for
regulatory application to the National Telecommunications Commission. ·
Conducts
acceptance testing for new radio links based on path calculation and in
accordance to ITU recommendations using BER test for TDM, and RFC2544 for
Packet Radios. These radios include Aviat Eclipse Packet Node, Nera
Evolution, NEC DRS5000 and Fujitsu NFRX. ·
Handled
frequency planning, radio allocation and deployment of Harris/Aviat Super PDH
Microwave Radio Project Phases 6-10, and Packet Radio Phase 1 for Smart
Communications Inc. Wired Transport: Fiber Optic
Network planning, calculation and implementation for FITL/DFON: · Map study and actual survey for possible routes of fiber
optic cable using road maps, topographical maps, GIS-based applications such
as FalconView, Google Earth and the manual measuring tool roller meter. · Designed and plotted the proposed optical fiber network in
a map for aerial, underground or direct buried plan and prepare a costing for
project approval. · Solid grasp of fiber optic technology such as fiber optic
cable components, fiber types, connector types, path panels, and fiber optic
outside plant standards. · Conducted optical fiber testing and acceptance with
JDSU/Anritsu test equipment. ·
Assessment and
dimensioning of multiplexers with regard to the site requirement and power
budget calculations. These include ECI XDM100/300/500, Tellabs 6320 ·
Troubleshooting
of optical networks using JDSU/Anritsu OTDR and Data Testers. Project Management Handled major projects for backbone, intermediate and last mile
networks: ·
STM-16 / STM-64
/ 10G rings of FITL Projects, DFON and MW Radio SDH Backbone, and Transmission
Solution for 2G, 3G, HSPA, Broadband, Wimax and LTE requirement. · Has extensive experience with end-to-end project
management, coordination with vendors regarding site surveys, costing, Bill
Of Materials preparation, Purchase Requests, project design, project
implementation and project acceptance. Training and
Development Part of the training team who provides lectures
to newly hired engineers regarding the current transport technologies and equipment
used in the network; and as resource speaker to engineering undergraduates in
accordance to the company’s commitment to its corporate social
responsibility. Media and
Publication Editor-in-Chief of “Transcripto”, the official
newsletter of Smart’s Transmission and Support Facilities Department
Trainings and Certifications
|
||||||||||||||||||||||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||
|
|||||||||||||||||||||||||||||||||||||||
|
|